Mailinglist Archive: yast-devel (85 mails)

< Previous Next >
Re: [yast-devel] Postponing metapackage/single click install to post 10.3
  • From: Andreas Jaeger <aj@xxxxxxx>
  • Date: Thu, 12 Jul 2007 13:20:53 +0200
  • Message-id: <hoejjdzx4a.fsf@xxxxxxxxxxxxx>
Lukas Ocilka <lukas.ocilka@xxxxxxx> writes:

> Benji Weber wrote:
>> Greetings all,
>
>> I unfortunately don't think it is going to be possible to get the
>> metapackage handler / single click install feature ready for 10.3. The
>> current situation is:
>
>> - There is a version in factory with major bugs and incomplete
>> functionality.
>
>> - There is a version I'm working on using the new specification
>> [http://en.opensuse.org/Standards/One_Click_Install] which I am
>> unlikely to have time to complete within the next 2 weeks, as I am
>> still working full time and moving house. As I understand it, alpha 6
>> (final alpha) freeze is this Friday.
>
>> This is entirely my fault as I drastically underestimated the amount
>> of time I would require to complete the implementation of the handler
>> for the finalised specification of the metapackages, and consequently
>> wasted too much time working on a ycp -> codedom project. I have hit a
>> number of problems that have delayed me considerably, particularly as
>> with mvidner away there is no YCP guru on IRC.
>
> Hi,
>
> Frankly, I don't think you've failed here, terms are always to be
> postponed :) Some features can even get an exception-privilege to be
> delivered after a freeze deadline but you'll need to talk to AJ (in Cc:).

Yes, exceptions are possible, talk to me once you know a bit more and
let's discuss what makes sense,

Andreas
-- 
 Andreas Jaeger, Director Platform / openSUSE, aj@xxxxxxx
  SUSE LINUX Products GmbH, GF: Markus Rex, HRB 16746 (AG Nürnberg)
   Maxfeldstr. 5, 90409 Nürnberg, Germany
    GPG fingerprint = 93A3 365E CE47 B889 DF7F  FED1 389A 563C C272 A126
< Previous Next >
Follow Ups